When and Where: |
Summer 2009 - Newark |
Category: |
Addition |
Description: |
Framed new 250 sq ft addition with gable roof, landing steps, sliding
door & skylight. |

|
|
|
 |
When and Where: |
Summer 2009 - Dublin |
Category: |
Roof over back-yard |
Description: |
Built 300 sq ft shingle roof covers for back-yard. |

|
|
|
 |
When and Where: |
Summer 2009 - Oakland |
Category: |
Stair-case |
Description: |
New stair case landing w/ stair case, railing & roof cover |

|
|
|
|
When and Where: |
Summer 2009 - San Carlos |
Category: |
Drive -way |
Description: |
Installed structural cross beam for driveway support. |

|
|
|
|
When and Where: |
Summer 2009 - Oakland |
Category: |
Fence |
Description: |
Rebuilt 50 ft fence |

|
|
|
|
When and Where: |
Summer 2009 - San Carlos |
Category: |
Deck |
Description: |
Built 500 sq ft Deck w/ 20 foot long
stair case w/ gate
and stained. |

|
|
. |
 |
When and Where: |
Summer 2009 - Oakland |
Category: |
Deck |
Description: |
Built 200 sq ft deck w/ framed awning
and stained. |

|
|
|
 |
When and Where: |
Spring-2009 - San Carlos |
Category: |
Deck |
Description: |
Built
200 sq ft redwood deck with railing gate |

|
|
|
 |
When and Where: |
Spring 2009 - Hayward |
Category: |
Flagstone wall |
Description: |
Built 40 foot concrete retaining wall
dressed up w/ flagstones and bullnose. |

|
|
. |
|
When and Where: |
Spring 2009 - Oakland |
Category: |
Structural wall |
Description: |
Removed
structural walls w/ new footings. Built several arched doorways, laid
new wood flooring. |

|
|
|
 |
When and Where: |
Spring-2009 -Hayward |
Category: |
Gazebo |
Description: |
Built
350 sq ft redwood deck with custom gazebo (180 sq ft). Benches w/
flowers boxes. |

|
|
|
|
When and Where: |
Spring-2009 - Hayward |
Category: |
Deck |
Description: |
Built 150 sq ft Redwood deck. |

|
|
|
 |
When and Where: |
Spring 2009 - Oakland |
Category: |
Deck with gazebo |
Description: |
Built 150 sq ft Redwood Deck |

|
|
|
 |
When and Where: |
Spring 2009 - Oakland |
Category: |
Patio Cover |
Description: |
Built 160 sq ft wood framed Awning over deck. |

|
|
|
|
When and Where: |
Spring 2009 - Oakland |
Category: |
Deck |
Description: |
Built deck to structurally hold
Jacuzzi. Install Jacuzzi transformed 1000
sq ft concrete backyard into green
lawn w/ sprinkler
system. |

|
|
|
 |
When and Where: |
Winter 2008-09 - Oakland |
Category: |
Garage & Addition |
Description: |
Built
1,400 sq ft addition w/ foundation + slab staircase, upper story w/ deck
over garage & master suite, set window + doors, applied lap siding &
roofing. |

|
|
|
|
When and Where: |
Winter 2008-09 - Hayward |
Category: |
Bathroom/ Kitchen |
Description: |
Install new bathroom and new kitchen, included tiling |

|
|
|
|
When and Where: |
Winter 2008-09 - Hayward |
Category: |
Restaurant/ Bar |
Description: |
New bathroom floor, walls covering and two new sinks installed to pass
health inspection report. |

|
|
|
 |
When and Where: |
Winter 2008 - Oakland |
Category: |
Triple level Deck |
Description: |
Built
3rd floor 300 sq feet deck.
Set new French door. |
|
|
|
|
When and Where: |
Fall 2008 - Oakland |
Category: |
Basement |
Description: |
Add 300 sq ft by removing soil from under
the house.
Seismic & Structural upgrade w/ new
retaining wall, concrete slab and shear wall.
Built 2 bathrooms, 2 bedrooms, 1 kitchen.
Landscaping back yard,
Built 2 level deck w/ stair. |
|
|
|
 |
When and Where: |
Fall 2008 - Hayward |
Category: |
Retaining wall |
Description: |
Removed collapsing concrete retaining wall & built
new. Exchange water heater. |
|
|
|
View
Deck
 |
When and Where: |
Spring 2008 - Oakland |
Category: |
Triple level Decks |
Description: |
Built triple level
Deck w/ staircases. Seismic upgrade. Built 150 sq ft Fence and
laid 1000 sq ft new sod w/ sprinkler system. |

|
|
|
View Patio
 |
When and Where: |
Spring 2008 - Oakland |
Category: |
Patio cover |
Description: |
Framed 700 sq ft Patio cover w/ corrugated roof panels |

|
|
|
 |
When and Where: |
Winter 2008 - Oakland |
Category: |
Deck |
Description: |
Built 300 sq ft DECK, and stabilized house w/ three 4 tons concrete
pier. Dug to bottom of foundation. Applied new water proofing membrane &
drain system. |

|
|
|
 |
When and Where: |
Winter 2007/08 - San Leandro |
Category: |
Foundation |
Description: |
Poured new drag footing for existing
piers. Bolted house to foundation.
Changed existing galvanized plumbing to copper |

|
|
|
View
Fence
 |
When and Where: |
Winter2008 - Hayward |
Category: |
Fence |
Description: |
Built 60 ft fence w/ 3 gates |

|
|
|
 |
When and Where: |
Winter2007 - Montclair |
Category: |
Addition |
Description: |
Finalized 2 years of 660 sq ft engineered & permitted addition w/
master bedroom, bathroom & master closet. Plus for the remodeling of 3
bedrooms/ kitchen/ 4 bathroom & 2 laundry rooms + decks. |

|
|
|
View Deck
 |
When and Where: |
Winter 2007 - San Leandro |
Category: |
Deck |
Description: |
Built 400 sq ft 2 story deck over creek. Install French doors |

|
|
|
 |
When and Where: |
Fall 2007 - Union City |
Category: |
Roof Top |
Description: |
Built 400 sq ft roof deck over patio. |

|
|
|
 |
When and Where: |
Fall 2007 - Oakland |
Category: |
Foundation |
Description: |
New foundation for existing guest house. |
|
|
|
 |
When and Where: |
Summer 2007 - Montclair |
Category: |
Addition |
Description: |
Seismic structural upgraded 3000 sq ft home for third floor addition with new staircase, Master Bathroom, Bedroom, Walk-in closet to match the existing. |

| |
|
 |
When and Where: |
Spring 2007 - Hayward |
Category: |
Landscaping |
Description: |
Put new 130 foot 2 level retaining wall on hill side for more space & laid 3,000 sq ft sod. |

| |
|
 |
When and Where: |
Winter 2007 - Hayward |
Category: |
Bathroom |
Description: |
Renovated bathroom. Relocated plumbing for sink & tub. Tiled walls & floor. Installed new skylight |

| |
|
 |
When and Where: |
Winter 2007 - Oakland |
Category: |
Rain Water Problem - Had a flooded basement & moving interior slab. |
Description: |
Stabilized house w/ 6 tons concrete pier. Dug to bottom of foundation on the outside. Applied new water proofing membrane & drain system w/ sum pump & backfilled. |
| |
|
 |
When and Where: |
Winter 2006 and 2007 - Montclair |
Category: |
Foundation |
Description: |
Upgraded foundation for new structure w/ new retaining wall & footing underneath the house. Split 1 bathroom into 2 rooms: 1 laundry 1 3/4 bath & relocated upper bathroom for room efficiency. |

| |
|
 |
When and Where: |
Fall 2006 - Oakland |
Category: |
Attic Addition |
Description: |
Changed roof line for more sq. ft. new plumbing & electrical for new laundry room & bathroom. Added 3 bedrooms. |

| |
|
 |
When and Where: |
Fall 2006 - Oakland |
Category: |
Addition |
Description: |
Built new office shed structure & new fence. |

| |
|
 |
When and Where: |
Summer 2006 - Hayward |
Category: |
Remodel |
Description: |
Supporting load bearing wall. Built new entertainment center. Remodeled 1/2 bathroom tiled new floors. |

| |
|
 |
When and Where: |
Summer 2006 - Hayward |
Category: |
Bathroom |
Description: |
Remodel master bathroom w/ new plumbing, electric, new tiled shower & floor. |

| |
|
 |
When and Where: |
Summer 2006 - Hayward |
Category: |
Bathroom |
Description: |
Built 2 new bathrooms w/ new plumbing, new tiled showers & floors. |

| |
|
 |
When and Where: |
Spring 2006 - Montclair |
Category: |
Kitchen |
Description: |
Renovated existing kitchen cabinets. Installed stainless steel backsplash w/ granite tiles insert. Installed new sink into granite countertop. |

| |
|
 |
When and Where: |
Spring 2006 - Rockridge |
Category: |
Bathroom |
Description: |
Renovated bathroom; upgraded plumbing, new tiled shower, tiled and countertop with backsplash. |

| |
|
 |
When and Where: |
Winter 2006 - Montclair |
Category: |
Windows/Doors |
Description: |
Exchanged olds windows and sliding glass doors to customs built wood frame and windows. Shear wall interior floor for seismic upgrade. |

| |
|
 |
When and Where: |
Winter 2005 and 2006 - Lafayette |
Category: |
Addition |
Description: |
Moved exterior wall 4' out for new master bathroom and 3/4 bathroom. Exchanged roof line. Upgraded electrical and install kitchen cabinet. Tiled all floors and showers. Built 150 Sq. Ft. Redwood deck. |

| |
|
 |
When and Where: |
Winter 2005 - Hayward |
Category: |
Deck |
Description: |
Removed old deck. Built new 2 levels 900 Sq. Ft. Redwood deck w/ staircase & railing. Reinforced existing foundation. Built 70 Ft. fence w/3 gates. some electrical and gas line removal. Poured 300 Sq. Ft. concrete slab in back-yard. |

| |
|
 |
When and Where: |
Fall 2005 - Hayward |
Category: |
Gas Line |
Description: |
Installed gas line for new kitchen stove (short time notice) |

| |
|
 |
When and Where: |
Fall 2005 - Hayward |
Category: |
Deck |
Description: |
Built 200 Sq. Ft. redwood deck with railing and steps. Exchanged and weatherproofed 5 French doors. |

| |
|
 |
When and Where: |
Summer 2005 - Berkeley |
Category: |
Addition |
Description: |
Build out interior of 800 Sq. Ft. addition, with new kitchen & custom cabinets, bathroom, and bedroom & storage. |

| |
|
 |
When and Where: |
Spring 2005 - Hayward |
Category: |
Addition |
Description: |
Remove old windows. Extended living room by moving exterior wall 5 feet. Set new windows & a French door. Built a custom bay window with storage. Applied new shingles siding. |

| |
|
 |
When and Where: |
Spring 2005 - Concord |
Category: |
Bathroom |
Description: |
Removed old bathroom. Upgraded plumbing. Installed new tube, new vanity, set new tiles on floor & walls. Upgraded electrical in the house with new sub-panel. |

| |
|
 |
When and Where: |
Spring 2005 - Castro Valley |
Category: |
Remodel |
Description: |
Remodeled bathroom. Set new exterior walls & windows. Finish walls, install new electrical. Moved load bearing doorway. Built arbor with gate. |

| |
|
 |
When and Where: |
Spring 2005 - Oakland Hills |
Category: |
Addition |
Description: |
Built 800 Sq Ft addition and dried structure in shear walled exited structure. Upgraded foundation and deck for new structure. |

| |
|
 |
When and Where: |
Winter 2005 - Hayward |
Category: |
Front Porch |
Description: |
Removed rotten wooden front porch. Built new and painted. |
This is just a small view of the jobs we have done over the years. If you would like to talk to us about work you need done please call us during business hours at 800-291-1967, or if you are local to Hayward please call 690-0790. If you prefer you can use our contact form to email us.

|